Our Senior Project Manager paid a visit to site to conduct final preparations on a new multi-million pound turnkey project.

The newly completed building includes more than 42,000 sq ft of warehouse space and more than 12,000 sq ft of two-storey office space.

The project will include:

  • 38,000+ sq ft. two-storey mezzanine
  • Pallet racking bays
  • Shelving bays
  • Inbound conveyor system for stock replenishment at multiple levels
  • Outbound system fully interfaced to client WMS

CSL are the Principal Designer & Contractor for the duration of the project, and will also manage the installation of solar PV panels and coldroom installation.

The conveyor and automation system will include Interroll conveyors, an Ambaflex Spiral Elevator and a Qimarox Vertical Lift, as well as facilitating checkweighing and print & apply shipping labels.

There will be lots more to come as the project progresses!

Creating relationships that last

We are proud to have completed installations over more than 25 years for many major organisations. We have forged strong relationships and continue to provide automation solutions through ongoing maintenance or follow-on projects. Constantly working with our customers to meet and exceed their needs.

"I have found working with CSL the ideal partnership, they understood the brief and worked closely with CEF to ensure the design met all of the criteria. The support from start to finish was excellent. The project ran smoothly from start to finish. The system has made our new warehouse very efficient and allowed us to increase the throughput"  

Craig Marks

Divisional Manager, CEF Online

“As this was a new facility it was difficult to visualise the conveyor system prior to the mezzanine floor installation, but CSL provided a detailed 3D drawing which included both the mezzanine and the conveyors which brought clarity to this. The install process was smooth and the end results have allowed us to increase control, flexibility & volumes”

Dan Corrigan

Head of Logistics & Operations Dev, Wiggle

“We have worked with CSL previously and after many years of reliable operation we decided to use CSL again to design, supply and carry out the installation. As with the last system the benefits became almost immediately evident” 

 

Spokesperson

Logistics, NHS

We Design, Install and Maintain Conveyor Systems

Find out more